Most consulting frameworks are three alliterating words that sound designed rather than used. We had one of those, Assess / Assemble / Accelerate, and threw it out. "Assess" was a weaker synonym for the Discovery we were already doing, and "Accelerate" was an outcome dressed up as a step.
What replaced it isn't a cleverer set of words. It's the actual sequence work passes through, named after what happens there. Some stations are short. Intake can be a single conversation. Others take most of the engagement. Two of them, Discovery and Assembly, are load-bearing enough that we put them on the door.
The practical effect: you get a written findings document at the end of Discovery whether or not you build with us. If what you asked for isn't what you need, that's when we say so, before anyone has spent money on the wrong thing. And nothing moves to Assembly on a hunch. Station 03 exists so the expensive commitment is made against a tested prototype rather than a confident opinion.
The last station is the one that matters most and the one nobody sells you. Delivery is where most engagements end, which is exactly when the drift starts: volumes grow, rules change, the workaround creeps back in. Inspection is a standing return on an agreed cadence, and what it finds goes back into Discovery. The line is a loop, not an arrow.